Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Installation of electricity supply system, 12th floor. — Installation of water supply system, 7th, 19th floor. 2. Facade works. Insulation of the facade on balconies, 14, 16 floors. 3. Works in the workshop. Fabrication of embedded parts. 4. finishing works, 3 floor. Laying ceramic tiles on the balconies. 5. Diamond drilling of engineering holes. For the device of communication systems. 6. Plasterboard frame installation works, 20th floor. Closing of the frame. 7. Works on the roof. Block masonry on the roof of the building. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electricity supply system, 12th floor.
— Installation of water supply system, 7th, 19th floor.

2. Facade works.
Insulation of the facade on balconies, 14, 16 floors.

3. Works in the workshop.
Fabrication of embedded parts.

4. finishing works, 3 floor.
Laying ceramic tiles on the balconies.
5. Diamond drilling of engineering holes.
For the device of communication systems.

6. Plasterboard frame installation works, 20th floor.
Closing of the frame.

7. Works on the roof.
Block masonry on the roof of the building.