Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Installation of storm water drainage risers, 18–20 floors. — Electrical installation, 8th floor. — Plumbing works, 13th floor. 2. Facade works, 16–18 floors. Insulation of the facade. 3. Masonry works, 10th floor. Ceramoblock masonry. 4. Installation of elevator shafts. Installation of elevator equipment. 5. Work on the floor screed. Works on the 14th floor. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of storm water drainage risers, 18–20 floors.
— Electrical installation, 8th floor.
— Plumbing works, 13th floor.

2. Facade works, 16–18 floors.
Insulation of the facade.

3. Masonry works, 10th floor.
Ceramoblock masonry.

4. Installation of elevator shafts.
Installation of elevator equipment.

5. Work on the floor screed.
Works on the 14th floor.