Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Plumbing work, installation of fixtures.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Installation of plasterboard frames.
Installation of ceiling frames.
4. Plastering work.
Application of decorative plaster on balconies.
5. Masonry work, 10th floor.
Laying ceramic blocks.
6. Drilling engineering holes.
For further installation of engineering networks.
7. Infrastructure building.
Monolithic work, installation of formwork for the floor slab of the 3rd floor.