Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Plumbing work, installation of fixtures. — Electrical installation work. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Installation of plasterboard frames. Installation of ceiling frames. 4. Plastering work. Application of decorative plaster on balconies. 5. Infrastructure building. Dismantling of formwork for vertical structures, 3rd floor. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Plumbing work, installation of fixtures.
— Electrical installation work.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Installation of plasterboard frames.
Installation of ceiling frames.

4. Plastering work.
Application of decorative plaster on balconies.

5. Infrastructure building.
Dismantling of formwork for vertical structures, 3rd floor.