Wyndham Grand Batumi Gonio. Aqua 1. Installation of utilities systems. — Wiring, the 14th floor. — Installation of water supply system, the 13th — 15th floors. 2. Facade works. — The facade winterization on the balconies, the 3rd, 5th, 12th, 20th floors. 3. Installation of drywall framing. — Installation of frame guides for drywall partitions, the 19th -20th floors. — Sheathing of the drywall frame, the 11th floor. 4. Masonry works. On the 2nd — 20th floors. 5. Floor screeding. On the balconies and in the units, the 15th — 16th floors. 6. Fabrication and installation of the doors by floors. On the 2nd — 20th floors. 7. Workshop. Fabrication of the embedded parts. 8. Infrastructure building. Reinforcement of the floor slab. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of utilities systems.
— Wiring, the 14th floor.
— Installation of water supply system, the 13th — 15th floors.

2. Facade works.
— The facade winterization on the balconies, the 3rd, 5th, 12th, 20th floors.

3. Installation of drywall framing.
— Installation of frame guides for drywall partitions, the 19th -20th floors.
— Sheathing of the drywall frame, the 11th floor.

4. Masonry works.
On the 2nd — 20th floors.

5. Floor screeding.
On the balconies and in the units, the 15th — 16th floors.

6. Fabrication and installation of the doors by floors.
On the 2nd — 20th floors.

7. Workshop.
Fabrication of the embedded parts.

8. Infrastructure building.
Reinforcement of the floor slab.