Wyndham Grand Batumi Gonio. Aqua

1. Facade works.
— Plastering of facade walls, on the 2nd — 20th floors.

2. Installation of utilities systems.
— Hot and cold water supply risers are being installed (horizontal layout), the 6th- 12th floors.
— Wiring on the balconies, the 20th floor.

3. Diamond core drilling for engineering openings, the 8th -9th floors.
Marking and drilling of precise openings for the installation of utilities in the future hotel.

4. Ceramic block installation, the 10th floor.
Ceramic blocks are being installed.

5. Elevator shafts installation
— Laying of gas silicate blocks, the 8th -9th, 11th — 12th floors.

6. Suspending ceiling installation.
On the balconies, the 3rd floor.