Wyndham Grand Batumi Gonio. Aqua
1. Facade works.
— Plastering of facade walls, on the 7th — 18th floors.
2. Fabrication and installation of steel arches
Balconies on the 9th, 19th floors.
2. Waterproofing
On the balconies of the 16th floor.
3. Elevator shafts are being installed.
— Laying of aerated silicate blocks, on the 3rd — 4th floors.
4. Floor screeding
The screeding is in progress on the 18th floor.
5. Drywall frame installation.
— Installation of partitions, the 19th — 20th floors.