Wyndham Grand Batumi Gonio. Aqua1. Facade works, the 16th – 18th floors. This includes the installation of facade elements on balconies. Facade is being winterized. 2. Installation of stained glass, the 14th – 15th floors. The stained glass is being installed on the 14th – 15th floors, and the construction of ledges for stained glass is in progress on the 13th – 16th floors. This ensures light permeability and improves thermal and sound insulation for hotel rooms. 3. Installation of drywall frames for internal partitions. Thus provides a strong and stable foundation for wall construction. Enclosing niches on the 3rd floor and profile installation on the 3rd -9th floors are in progress. 4. Installation of decorative steel columns, floor 10th. 5. Installation of plumbing and sewage systems. Installation of rainwater drainage outlets on the 10th floor. 6. Mockup installation, 13th floor. Tile installation. 7. Installation of ceramic blocks, 20th floor. Laying ceramic blocks in accordance with the technology. 8. Floor screeding on balconies, 13th to 15th floors. 9. Ventilation system installation, the 3rd floor.