Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Facade arrangement.
— Works on facade insulation and partition walls on balconies.
— Plastering of the facade.
2. Installation of monolithic belt on the roof parapet.
3. Plastering works.
Plastering of internal walls, 3, 5 floors.
4. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.
5. Arrangement of storm water drainage.
Installation of storm water drainage drains.
6. Welding works.
Fabrication of metal arches.
Block B
1. Plastering works.
Plastering of internal walls, 2nd floor.
2. Masonry works, 5th floor.
Ceramoblock masonry.