Wyndham Grand Batumi Gonio. Family Club. Block A 1. Facade construction. — Works on facade insulation and partition walls on balconies. — Plastering of walls on balconies, 1, 4 floors. 2. Plastering works, 5th floor. Plastering of internal walls. 3. Arrangement of the ceiling frame on the balconies. On the 2–3 floors. 4. Making metal boxes on balconies and terraces. Block B 1. Plastering works. Plastering of internal walls, 3rd floor. 2. Masonry works. Ceramoblock masonry, 5th floor. 3. Installation of engineering systems. Arrangement of storm water drainage risers. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Facade construction.
— Works on facade insulation and partition walls on balconies.
— Plastering of walls on balconies, 1, 4 floors.

2. Plastering works, 5th floor.
Plastering of internal walls.

3. Arrangement of the ceiling frame on the balconies.
On the 2–3 floors.

4. Making metal boxes on balconies and terraces.

Block B
1. Plastering works.
Plastering of internal walls, 3rd floor.

2. Masonry works.
Ceramoblock masonry, 5th floor.

3. Installation of engineering systems.
Arrangement of storm water drainage risers.