Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Facade construction.
— Works on facade insulation and partition walls on balconies.
— Plastering of walls on balconies, 1, 4 floors.
2. Plastering works, 5th floor.
Plastering of internal walls.
3. Arrangement of the ceiling frame on the balconies.
On the 3rd floor.
4. Making metal boxes on balconies and terraces.
Block B
1. Masonry works.
Ceramoblock masonry, 5th floor.
2. Installation of engineering systems.
Arrangement of storm water drainage risers.