Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Finishing work.
Laying porcelain stoneware on balconies.
2. Plastering work.
— Application of decorative plaster on balconies and stained glass slopes.
— Plastering of walls.
3. Facade work.
— Insulation of the facade, installation of mineral wool.
— Grouting of clinker tile joints on the facade.
Block B
1. Plastering work.
Plastering of interior walls.
2. Facade work.
Plastering of the facade.
3. Installation of elevator shafts.
Installation of the reinforced frame of the elevator shaft lintels.
4. Installation of ceilings.
Installation of ceiling frames on balconies.
5. Drilling of engineering holes.
For the subsequent installation of engineering systems.
6. Installation of stained glass structures, 2nd and 3rd floors.
Installation of stained glass and glass.