Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Finishing work.
Laying porcelain stoneware on balconies.
2. Plastering work.
Plastering balconies.
3. Facade work.
— Plastering the facade.
— Insulating the facade, installing mineral wool reinforcement.
— Installing metal mesh for clinker tile cladding on the facade.
4. Installing elevator shafts.
Laying blocks in elevator portals.
5. Workshop work.
Manufacture of stairs and preparation of material for radius arches of balconies.
6. Waterproofing work.
— Installation of a second layer of coating waterproofing on balconies, 3rd floor.
— Waterproofing the roof, preparing the membrane for installation.
Block B
1. Installation of ceilings.
Installation of ceiling frames.
3. Facade work.
Installation of mineral wool slopes on balconies.