Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Finishing work.
Laying porcelain stoneware on balconies.
2. Plastering work.
Plastering walls.
3. Facade work.
Insulation of the facade, installation of mineral wool.
Block B
1. Facade work.
Plastering of the facade.
2. Installation of elevator shafts.
Installation of the reinforced frame of the elevator shaft lintel, concreting of the lintel.
3. Installation of ceilings.
Installation of ceiling frames on balconies.
4. Drilling of engineering holes.
For subsequent installation of engineering systems.
5. Installation of stained glass structures, 2nd and 3rd floors.
Installation of stained glass and glass.