Wyndham Grand Batumi Gonio. Family Club. Block A 1. Finishing works. Laying porcelain stoneware on balconies. 2. Plastering works. Plastering walls. 3. Facade work. — Plastering the facade. — Insulating the facade, installing a reinforcement layer over mineral wool. 4. Installing lift shafts. Laying blocks in lift portals. 5. Workshop work. Manufacturing stairs. Block B 1. Installation of ceilings. Installation of ceiling frames. 2. Drilling of engineering holes. For the subsequent installation of engineering systems. 3. Facade work. Insulation of the facade, installation of mineral wool. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Plastering works.

Plastering walls.

3. Facade work.

— Plastering the facade.

— Insulating the facade, installing a reinforcement layer over mineral wool.

4. Installing lift shafts.

Laying blocks in lift portals.

5. Workshop work.

Manufacturing stairs.

Block B

1. Installation of ceilings.

Installation of ceiling frames.

2. Drilling of engineering holes.

For the subsequent installation of engineering systems.

3. Facade work.

Insulation of the facade, installation of mineral wool.