Wyndham Grand Batumi Gonio. Family Club. Block A 1. Finishing works. Laying porcelain stoneware on balconies. 2. Plastering works. Plastering walls. 3. Facade works. Facade insulation, installation of mineral wool. 4. Workshop work. Manufacture of stairs and preparation of material for radius arches on balconies. Block B 1. Facade work. — Facade insulation, installation of mineral wool on the 2nd and 3rd floors. — Plastering the facade. 2. Installation of lift shafts. Formwork for lift shaft portal beams. 3. Drilling of engineering holes. For subsequent installation of engineering systems. 4. Installation of stained glass structures. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Plastering works.

Plastering walls.

3. Facade works.

Facade insulation, installation of mineral wool.

4. Workshop work.

Manufacture of stairs and preparation of material for radius arches on balconies.

Block B

1. Facade work.

— Facade insulation, installation of mineral wool on the 2nd and 3rd floors.

— Plastering the facade.

2. Installation of lift shafts.

Formwork for lift shaft portal beams.

3. Drilling of engineering holes.

For subsequent installation of engineering systems.

4. Installation of stained glass structures.