Wyndham Grand Batumi Gonio. Family Club. Block A 1. Finishing works. Laying porcelain stoneware on balconies. 2. Waterproofing works. Installation of coating waterproofing on balconies. 3. Plastering work. — Application of decorative plaster on balconies and stained glass slopes. — Plastering of stairwells. — Plastering of walls. 4. Facade work. Facade insulation, installation of XPS reinforcement on the facade. Block B 1. Plastering work. Plastering of interior walls. 2. Facade work. Plastering of the facade. 3. Installation of elevator shafts. 4. Installation of storm drainage. Covering of storm drainage boxes on balconies with concrete panels. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Waterproofing works.

Installation of coating waterproofing on balconies.

3. Plastering work.

— Application of decorative plaster on balconies and stained glass slopes.

— Plastering of stairwells.

— Plastering of walls.

4. Facade work.

Facade insulation, installation of XPS reinforcement on the facade.

Block B

1. Plastering work.

Plastering of interior walls.

2. Facade work.

Plastering of the facade.

3. Installation of elevator shafts.

4. Installation of storm drainage.

Covering of storm drainage boxes on balconies with concrete panels.