Wyndham Grand Batumi Gonio. Family Club. Block A 1. Installation of engineering systems, 2–3 floor. Installation of storm water drainage box frame. Block B 1. Plastering works. Plastering of walls on balconies, 5th floor. 2. Work on the device of elevator shafts. Drilling of engineering holes. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Installation of engineering systems, 2–3 floor.
Installation of storm water drainage box frame.

Block B
1. Plastering works.
Plastering of walls on balconies, 5th floor.

2. Work on the device of elevator shafts.
Drilling of engineering holes.