Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Installation of engineering systems, 2–3 floor.
Installation of storm water drainage box frame.
Block B
1. Plastering works.
Plastering of walls on balconies, 5th floor.
2. Work on the device of elevator shafts.
Drilling of engineering holes.