Wyndham Grand Batumi Gonio. Family Club. Block A 1. Plastering work. Plastering of slopes, 1st and 2nd floors. 2. Facade work. — Facade and slope cladding with clinker tiles. — Plastering of the facade. — Facade insulation. 3. Installation of plasterboard frame. Ceiling frame covering. 4. Waterproofing work. Preparatory waterproofing work on terraces. 5. Installation of stained glass structures. Installation of stained glass and glass. Block B. 1. Masonry work. — Laying ceramic blocks on exterior walls, 5th floor. — Laying parapets on ventilation shafts on the roof. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Plastering work.
Plastering of slopes, 1st and 2nd floors.

2. Facade work.
— Facade and slope cladding with clinker tiles.
— Plastering of the facade.
— Facade insulation.

3. Installation of plasterboard frame.
Ceiling frame covering.

4. Waterproofing work.
Preparatory waterproofing work on terraces.

5. Installation of stained glass structures.
Installation of stained glass and glass.

Block B.
1. Masonry work.
— Laying ceramic blocks on exterior walls, 5th floor.
— Laying parapets on ventilation shafts on the roof.