Wyndham Grand Batumi Gonio. Family Club. Block A 1. Plastering work. Plastering of slopes, 1st and 2nd floors. 2. Waterproofing work. Preparation of terraces for waterproofing. 3. Facade work. Plastering the facade. 4. Reinforcement installation. — Installation of reinforcement on balcony ceilings. — Installation of reinforcement on balcony arches. — Installation of reinforcement on walls and slopes on balconies. Block B 1. Installation of monolithic sides. For subsequent installation of stained glass structures. 2. Roof work. Plastering work. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Plastering work.

Plastering of slopes, 1st and 2nd floors.

2. Waterproofing work.

Preparation of terraces for waterproofing.

3. Facade work.

Plastering the facade.

4. Reinforcement installation.

— Installation of reinforcement on balcony ceilings.

— Installation of reinforcement on balcony arches.

— Installation of reinforcement on walls and slopes on balconies.

Block B

1. Installation of monolithic sides.

For subsequent installation of stained glass structures.

2. Roof work.

Plastering work.