Wyndham Grand Batumi Gonio. Family Club. Block A 1. Plastering work. — Plastering of slopes, 2nd floor. — Plastering of walls, 2nd floor. 2. Installation of ceilings. — Installation of reinforcement on balcony ceilings. — Covering of balcony ceilings with concrete panels, 4th floor. 3. Facade work. Cladding the facade and slopes with clinker tiles. Block B. 1. Installation of monolithic sides. For the installation of stained glass structures. 2. Installation of stained glass structures. Installation of stained glass on the 2nd and 3rd floors. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Plastering work.
— Plastering of slopes, 2nd floor.
— Plastering of walls, 2nd floor.

2. Installation of ceilings.
— Installation of reinforcement on balcony ceilings.
— Covering of balcony ceilings with concrete panels, 4th floor.

3. Facade work.
Cladding the facade and slopes with clinker tiles.

Block B.
1. Installation of monolithic sides.
For the installation of stained glass structures.

2. Installation of stained glass structures.
Installation of stained glass on the 2nd and 3rd floors.