Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering work.
— Plastering of slopes, 2nd floor.
— Plastering of walls, 2nd floor.
2. Installation of plasterboard frame, 4th floor.
Ceiling frame covering.
3. Installation of stained glass structures.
Installation of
4. Installation of metal arches on balconies, 4th floor.
Arch covering.
Block B.
1. Installation of monolithic sides.
For the installation of stained glass structures.