Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering work.
— Plastering of slopes, 2nd floor.
— Plastering of walls, 2nd floor.
2. Installation of plasterboard frame, 4th floor.
Covering of ceiling frame.
3. Facade work.
Cladding of facade and slopes with clinker tiles.
Block B.
1. Installation of monolithic sides.
For installation of stained glass structures.