Wyndham Grand Batumi Gonio. Family Club. Block A 1. Plastering work. — Plastering of slopes, 3rd floor. — Plastering of the facade, installation of beacons for plastering. 2. Finishing work. Installation of ceramic granite floor tiles on the balcony. 3. Facade work. — Facade cladding with clinker tiles. — Facade insulation, reinforcement, and installation of mineral wool. Block B. 1. Masonry work. Ceramic block masonry, 5th floor. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Plastering work.
— Plastering of slopes, 3rd floor.
— Plastering of the facade, installation of beacons for plastering.

2. Finishing work.
Installation of ceramic granite floor tiles on the balcony.

3. Facade work.
— Facade cladding with clinker tiles.
— Facade insulation, reinforcement, and installation of mineral wool.

Block B.
1. Masonry work.
Ceramic block masonry, 5th floor.