Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering work.
— Plastering of slopes, 3rd floor.
— Plastering of the facade, installation of beacons for plastering.
2. Finishing work.
Installation of ceramic granite floor tiles on the balcony.
3. Facade work.
— Facade cladding with clinker tiles.
— Facade insulation, reinforcement, and installation of mineral wool.
Block B.
1. Masonry work.
Ceramic block masonry, 5th floor.