Wyndham Grand Batumi Gonio. Family Club
Block A
1. Plastering Works
Plastering of interior walls, 3rd floor.
2. Installation of Glazing Structures
Installation of
3. Masonry Works
Masonry of partitions on the 4th floor.
Masonry of ceramic block on the roof.
4. Glazing Installation
Installation of
5. Waterproofing Works
Preparation for waterproofing balconies, application of coating waterproofing.
6. Installation of Monolithic Belt on the Roof Parapet.
7. Installation of Drywall Frame
Installation of guiding frames for drywall partitions.
Block B
1. Diamond Drilling of Engineering Openings
For stormwater drainage system installation.
2. Plastering Works
Plastering of interior walls, 2nd floor.
3. Masonry Works
Masonry of ceramic block on the roof.