Wyndham Grand Batumi Gonio. Family Club.Building A 1. Ceramic block installation, the 1st floor. The ceramic blocks are being installed following the technology. 2. Facade works, on the 1st , 4th floors. Plastering of inner walls. 3. Drywall frame installation, the 4th floor. Building B. 1. Ceramic block installation, the 4th floor. The ceramic blocks are being installed following the technology. 2. The beam reinforcement.