Wyndham Grand Batumi Gonio. Family Club.Building A 1. Diamond core drilling for engineering openings on the 1st floor. Marking and drilling of precise openings for the installation of utilities in the future hotel. 2. Installation of drywall profiles, on the 4th floor. Ongoing works. It creates a strong and stable base that forms the walls. 3. Ceramic block installation on the roof. The ceramic blocks are being installed following the technology. 4. Insulation of the balconies. The waterproofing of the balconies on the 1st floor. Building B. 1. Ceramic block installation, on the 4th floor. Laying ceramic blocks in accordance with the technology. 2. Formwork installation, on the 5th floor. The formwork is installed to create the necessary shape for concrete pouring and structural formation.