Wyndham Grand Batumi Gonio. Family Club. Building A 1. Facade works. Plastering of facade walls, the 4th floor. 2. Installation of cast-in ledges on the balconies. The ledges are being formworked and reinforced for stained glass windows to be installed. 3. Facade works. 4. Stormwater drainage system installation. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Facade works.
Plastering of facade walls, the 4th floor.

2. Installation of cast-in ledges on the balconies.
The ledges are being formworked and reinforced for stained glass windows to be installed.

3. Facade works.

4. Stormwater drainage system installation.