Wyndham Grand Batumi Gonio. Family Club. Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained glass windows are installed. Building B 1. Ceramoblock masonry, 2nd floor Checking all dimensions and compliance with technological norms. 2. Column reinforcement works, 5th floor To increase the strength and stability of the columns, allowing them to withstand loads.