Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Installation of cast-in ledges on the balconies.
The ledges are being formworked and reinforced for stained glass windows to be installed.

2. Diamond core drilling for engineering openings.
Marking and drilling of precise openings for the installation of utilities in the future hotel. Total openings — 16.

3. Installation of drywall frames, the 1st floor.
Installation of guides for drywall partition frames.

4. Stained glass window installation, the 1st floor.

5. Facade works.
Plastering on the 1st floor.

Building B.
1. The formwork is getting ready for staircase slab installation