Wyndham Grand Batumi Gonio. Family Club.
Building A
1. Installation of
The ledges are being formworked and reinforced for stained glass windows to be installed.
2. Plastering, the 1st, 4th floors.
3. Installation of drywall frames, the 1st floor.
Installation of guides for drywall partition frames.
4. Facade works.
Facade winterization. The surface is getting ready for mineral wool installation on the balconies.
5.Installation of stained glass windows
Building B.
1. Masonry work, the 4th floor.
Ceramic block installation on the balconies.