Wyndham Grand Batumi Gonio. Family Club. Building A 1. Installation of stained glass windows. Glazing and stained glass windows to be installed. 2. Fabrication of hinges for elevator equipment installation. Building B. 1. Installation of ledges for the stained glass windows. On the 3rd floor. Due to weather conditions, no other construction work is underway at the site. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Installation of stained glass windows.
Glazing and stained glass windows to be installed.

2. Fabrication of hinges for elevator equipment installation.

Building B.
1. Installation of ledges for the stained glass windows.
On the 3rd floor.

Due to weather conditions, no other construction work is underway at the site.