Wyndham Grand Batumi Gonio. Riviera. 1. Block A, B, C. Facade works. Plastering of the facade. 2. Block B, C. Installation of double-glazed windows. Glass installation. 3. Block B. Installation of storm water drainage system. Flashing of storm sewerage ducts. 4. Block E. Screeding of townhouse backyards. Pouring of screed. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Block A, B, C. Facade works.
Plastering of the facade.

2. Block B, C. Installation of double-glazed windows.
Glass installation.

3. Block B. Installation of storm water drainage system.
Flashing of storm sewerage ducts.

4. Block E. Screeding of townhouse backyards.
Pouring of screed.