Wyndham Grand Batumi Gonio. Riviera
1. Block B. Plastering Works
Plastering of interior walls.
2. Block A. Formwork and Reinforcement of Contour Walls, Technical Floor.
3. Block A. Installation of Drywall Frame
nstallation of guiding frames for drywall partitions.
4. Block A.
Electrical installation.
5. Block A. Installation of Engineering Systems
Completion of sewage and ventilation system installation.
6. Block E. Installation of Glazing Structures
Slope finishing and
7. Block A. Floor Screed Installation on Terraces
Screed pouring on the 1st floor.
8. Block B, E. Waterproofing Installation.
9. Block C. Fireplace Installation
Chimney installation.
10. Infrastructure Building
Installation of formwork for stairwell slab.