Wyndham Grand Batumi Gonio. Riviera. 1. Block C. Formwork removal from and installation for the stair flights It ensures precise shape and geometry of the staircase, supports the concrete during curing, and guarantees surface quality and structural safety. 2. Block E. Plastering of inner walls. 3. Infrastructure building. - Ceramic blocks installation on the 1st -2nd floors. 4. Block E. Drywall frame installation. - European Village

Wyndham Grand Batumi Gonio. Riviera. 1. Block C. Formwork removal from and installation for the stair flights It ensures precise shape and geometry of the staircase, supports the concrete during curing, and guarantees surface quality and structural safety. 2. Block E. Plastering of inner walls. 3. Infrastructure building. – Ceramic blocks installation on the 1st -2nd floors. 4. Block E. Drywall frame installation.