Wyndham Grand Batumi Gonio. Riviera.1. Block С. Formwork removal from and installation for the staircases. It is necessary to create the precise shape and geometry of the staircase, support the concrete until it hardens, and ensure surface quality and structural safety. 2. Blocks A, B. Masonry work. Partitions are being constructed on the terrace on the 3rd floor in Blocks A and B. 3. Blocks C, E. The installation of fireplaces. The fabrication of framing structures for fireplace chimneys and the installation of flue pipes for the chimneys. 4. Infrastructure building. – Ceramic block installation. – Fabricating and installation of the steel columns on the 1st floor. 5. Mockup installation. – Utilities system installation, namely: sewage, heating, and water supply. – Inner communication system is being installed.