Wyndham Grand Batumi Gonio. Riviera.1. Block С. Formwork removal from and installation for the staircases. It is necessary to create the precise shape and geometry of the staircase, support the concrete until it hardens, and ensure surface quality and structural safety. 2. Block C. Installation of the ledges for the stained glass. The formwork is being installed, concrete is poured, and compacted. Once the concrete has gained sufficient strength, the formwork is dismantled, and stained glass is installed. 3. Block C. The installation of fireplaces. Fireplaces are being constructed, ensuring compliance with the design and high-quality execution. 4. Blocks B, C. Installation of the columns on the terrace. Formwork is being installed for the columns on the terrace, the 3rd floor. 5. Infrastructure building. – Ceramic block installation. – Fabricating and installation of the columns.