Wyndham Grand Batumi Gonio. Riviera.1. Ceramic block installation. Block B on the 2nd floor, Block C on the 3rd floor, Block A on the 1st floor, on the terrace. The ceramic blocks are being laid in accordance with the established standards. This process ensures that the walls are level and vertically aligned. All joints and angles are checked to meet the project specifications. 2. Formwork installation and removal from the staircases, and reinforcement. It is necessary to create the precise shape and geometry of the staircase, support the concrete until it hardens, and ensure surface quality and structural safety. 3. Block C. Construction of fireplaces. The construction of fireplaces is carried out in compliance with design specifications, ensuring precision, structural integrity, and superior quality standards. 4. Block A: Installation of the columns on the terrace, 3rd floor and the installation of the columns and cast-in belt on the 1st floor. 5. Block B: Roofing. 6. Block E: Plastering of parapets on the terrace.