Wyndham Grand Batumi Gonio. Riviera. 1. Plastering. — Plastering of inner walls in Block B, in Block A units 2 and 7. 2. Block B. Installation of staircases. Formwork installation for the inside staircases. 3. Masonry works. Ceramic block installation, basement. 4. Infrastructure building. Plastering. 5. Block A. Insulation system. Screeding on the mesh on the terraces. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Plastering.
— Plastering of inner walls in Block B, in Block A units 2 and 7.

2. Block B. Installation of staircases.
Formwork installation for the inside staircases.

3. Masonry works.
Ceramic block installation, basement.

4. Infrastructure building.
Plastering.

5. Block A. Insulation system.
Screeding on the mesh on the terraces.