Wyndham Grand Batumi Gonio. Villas. 1. Continuation of column reinforcement work, Villas 14, 16. It ensures the strength and stability of the columns, preventing deformation and enhancing the durability of the structure. 2. Installation of floor slab formwork, Villa 13. Formwork installation to create the necessary shape for concrete pouring and structural formation. 3. Fencing — Formwork installation for the fence poles. — Reinforcement of fence poles. — Installation of ceramic blocks. - European Village

Wyndham Grand Batumi Gonio. Villas.

1. Continuation of column reinforcement work, Villas 14, 16.
It ensures the strength and stability of the columns, preventing deformation and enhancing the durability of the structure.

2. Installation of floor slab formwork, Villa 13.
Formwork installation to create the necessary shape for concrete pouring and structural formation.

3. Fencing
— Formwork installation for the fence poles.
— Reinforcement of fence poles.
— Installation of ceramic blocks.