Wyndham Grand Batumi Gonio. Villas.1. Formwork installation for slabs, Villas 7-10 Installation of formwork to shape the slabs, essential for pouring concrete and forming the structure. 2. Continuation of slab reinforcement, Villas 7-10 It strengthens the structure, enhancing durability and ensuring long-term stability. 3. Floor slab insulation, Villa 16 It enhances the building’s energy efficiency by reducing heat loss. 4. Beginning of floor slab reinforcement, Villa 16 Reinforcement of the slab is to prevent deformations and ensure structural integrity. 5. Installation of floor slab formwork, Villa 15 Formwork is installed to shape the slab, preparing it for concrete pouring and structural formation. 6. Removal of floor slab formwork, Villa 14 Formwork is dismantled after the concrete has cured, finalizing the structure and preparing for the next construction stage. 7. Waterproofing of exterior foundation walls at Villa 14 and floor slab at Villa 16. 8. Fence installation. Formwork for the retaining wall of the fence is removed, while the formwork for the remaining sections is continued for concrete pouring.