Wyndham Grand Batumi Gonio. Villas.
1. Masonry works.
— Ceramoblock masonry exterior walls of the 1st floor, villa 11.
— Ceramoblock masonry exterior walls of the 2nd floor, villa 15, 16.
2. Installation of fireplaces, villa 9, 10.
Screed under the base of the fireplace.
3. Work on dismantling the staircase formwork from the 1st to the 2nd floor, villas 4, 3, 2.
Removal of the formwork after the concrete has hardened to complete the structure and prepare for the next stage of construction.
4. Arrangement of temporary fencing of staircases of the 2nd floor, villa 11, 12, 13, 14, 15.