Wyndham Grand Batumi Gonio. Villas. 1. Monolithic works. — Dismantling of floor slab formwork, villas 15–16. — Concrete pouring, villas 12–13, 15–16. 2. Plastering works. Plastering works have begun, villa 2. - European Village

Wyndham Grand Batumi Gonio. Villas.

1. Monolithic works.

— Dismantling of floor slab formwork, villas 15–16.

— Concrete pouring, villas 12–13, 15–16.

2. Plastering works.

Plastering works have begun, villa 2.