Wyndham Grand Batumi Gonio. Villas. 1. Reinforcement of the columns, Villas 6, 7, 8. It ensures the strength and stability of the columns, preventing deformation and increasing the building’s durability. 2. Formwork Removal — Columns, Villa 5. — Floor slab, Villa 13. As soon as the concrete has hardened, the formwork is removed to complete the structure and prepare for the next stage of construction. 3. Formwork Installation — Columns, Villa 1 — Floor slabs, Villas 2, 4. Installation of formwork is required to create the necessary shape for concrete pouring and structural formation. 4. Construction of the fence. Formwork is bein - European Village

Wyndham Grand Batumi Gonio. Villas.

1. Reinforcement of the columns, Villas 6, 7, 8.
It ensures the strength and stability of the columns, preventing deformation and increasing the building’s durability.

2. Formwork Removal
— Columns, Villa 5.
— Floor slab, Villa 13.

As soon as the concrete has hardened, the formwork is removed to complete the structure and prepare for the next stage of construction.

3. Formwork Installation
— Columns, Villa 1
— Floor slabs, Villas 2, 4.

Installation of formwork is required to create the necessary shape for concrete pouring and structural formation.

4. Construction of the fence.
Formwork is bein