Wyndham Grand Batumi Gonio. Villas. The following works are carried out on site: 1. Dismantling of the formwork of the growth chamber and foundation walls Careful removal of temporary structures after concrete hardening, which provides access to the foundation elements and prevents damage to their surface. 2. Installation of column formwork The process of creating molds for pouring concrete, where metal panels are used to ensure the desired geometry and strength of the structures. 3. Floor slab installation The laying of reinforcement framework, formwork installation and concrete pouring, which provides the necessary load-bearing capacity and sound insulation between floors. 4. Column reinforcement Installation of steel reinforcing bars inside the formwork, which increases the strength and resistance of the columns to loads and external influences. 5. Geodetic works