01.08.2024 Wyndham Grand Residences Batumi Gonio. Aqua Ceramoblock walls are being laid on the 1st construction floor (Ground Floor). Dusting of ceilings in common areas and installation of stained glass structures on the ground floor is also in progress. Technological openings in floor slabs are being made and Aqua+ excavation works are being carried out.