08.09.2024 Wyndham Grand Residences Batumi Gonio. Aqua Balconies are framed with reinforced concrete curbs, ceilings are dusted, plasterboard framework of internal partitions is installed, diamond drilling of engineering holes in floor slabs is carried out, anti-corrosion works are carried out. Stained glass windows are being installed. Ceramic block has been delivered to the site. - European Village

08.09.2024 Wyndham Grand Residences Batumi Gonio. Aqua Balconies are framed with reinforced concrete curbs, ceilings are dusted, plasterboard framework of internal partitions is installed, diamond drilling of engineering holes in floor slabs is carried out, anti-corrosion works are carried out. Stained glass windows are being installed. Ceramic block has been delivered to the site.