09.12.2023 Wyndham Grand Residences Batumi Gonio. Riviera Block A: in the first half the formwork of the floor slab of the 3rd floor is being assembled, in the second half the formwork of the floor slab above the 3rd floor is being assembled. Block B: excavation works are in progress Block E: lighting installation. - European Village

09.12.2023 Wyndham Grand Residences Batumi Gonio. Riviera Block A: in the first half the formwork of the floor slab of the 3rd floor is being assembled, in the second half the formwork of the floor slab above the 3rd floor is being assembled. Block B: excavation works are in progress Block E: lighting installation.