27.09.2024 Wyndham Grand Residences Batumi Gonio. Villas Dismantling of the formwork: columns (villas 3, 5), floor slab (villas 7-9), foundation walls (villas 11, 13), strip foundation (villa 12), fence foundation walls. And also primer treatment: under the waterproofing of the foundation wall adjoining the floor slab (villas 6-9) and under the waterproofing of the foundation walls inside (villas 11, 13). Fabrication of the reinforced column frames is in progress.